Skip to content

COT Lesson Plan: How to Prepare a Lesson for Classroom Observation (SY 2026-2027)

How to plan a lesson for a COT classroom observation under the DepEd PMES: which PPST indicators are observed in SY 2026-2027, a planning choice for each, what the guidelines say about your lesson plan, and a Grade 7 Science sample.

An isometric science classroom ready for an observation, with two cups of orange liquid, measuring spoons, a stirring rod, a graduated cylinder and a blank grid sheet on one table, a clipboard and pen on an empty chair, and a lesson plan in a clear sleeve.

A COT lesson plan is the lesson plan you submit and teach when a rater observes you with the Classroom Observation Tool (COT), the rubric DepEd uses to rate classroom observable indicators of the Philippine Professional Standards for Teachers (PPST). Teachers often call it the “RPMS COT”. There is no special COT form of lesson plan: it is your regular plan, built so that the observer can see each indicator scheduled for that observation.

This page explains the current rules (the RPMS is now the Performance Management and Evaluation System, or PMES), lists the indicators scheduled for SY 2026-2027, maps each one to planning choices, and gives a sample plan with a pre-observation checklist. It does not reproduce the official COT rubric: get that from your school head or rater.

From RPMS to PMES: what applies in SY 2026-2027

The current guidelines are DepEd Memorandum No. 089, s. 2025, the Guidelines on the Multi-Year Performance Management and Evaluation System (PMES) for Teachers from SY 2025-2026 to 2027-2028, dated 1 October 2025. We could not open deped.gov.ph when writing; the facts below come from the memorandum and its enclosure as attached to SDO Muntinlupa Memorandum No. 539, s. 2025. Its rationale gives the history:

IssuanceWhat it did
DepEd Order No. 2, s. 2015 and DepEd Order No. 42, s. 2017Cited as references; DO 42, s. 2017 adopted the PPST
DepEd Memorandum No. 008, s. 2023Multi-year RPMS-PPST guidelines, SY 2022-2023 to 2024-2025
DepEd Memorandum No. 37, s. 2024RPMS-PPST implementation suspended in July 2024 for a review
DepEd Memorandum No. 17, s. 2025Interim PMES guidelines for SY 2024-2025
DepEd Memorandum No. 089, s. 2025Multi-year PMES, effective SY 2025-2026 to 2027-2028

What DM 089 says about classroom observation:

  • Two full-period observations per school year: the first in the 1st or 2nd quarter, the second in the 3rd or 4th quarter, observed for the entire class period.
  • Rubric levels by career stage: Teachers I to III (Beginning towards Proficient) are rated on Levels 2 to 6 of the COT rubric; Teachers IV to VII (Proficient) on Levels 3 to 7. Master teachers use higher levels.
  • Only scheduled indicators are rated in each observation.
  • Short walkthrough observations of about 10 to 15 minutes are non-rated and formative.
  • No portfolio is collected for performance assessment.
  • The default mode is face-to-face; online or LAC-based observation may be considered only in the circumstances the memorandum describes.

For SY 2025-2026 only, a transition guidance dated 3 March 2026 (DM-OSEC-OUHROD1-2026-0001, attached to SDO Muntinlupa Memorandum No. 148, s. 2026) required just one full-period observation. Check whether a similar guidance is issued for SY 2026-2027.

Which indicators are observed in SY 2026-2027

DM 089 spreads all 37 PPST indicators over three school years, with 14 indicators (classroom and non-classroom) per year. For Teachers I to VII, these are the classroom observable indicators (COIs) for SY 2026-2027:

1st observation (Q1 or Q2)2nd observation (Q3 or Q4)
1.1.21.1.2
1.4.21.4.2
1.5.21.5.2
1.6.23.2.2
2.1.23.5.2
2.2.25.3.2

Indicators 1.1.2, 1.4.2 and 1.5.2 repeat in both observations; their final rating averages the two. Master teachers have their own lists in the memorandum (Tables 8 and 9). Confirm your list at the pre-observation conference, which DM 089 uses to review the rubric for your career stage and the indicators for that observation.

Map each indicator to planning choices

For five of these indicators we read the official wording in Enclosure 2 of DepEd Order No. 7, s. 2023, as reproduced in SDO Bulacan Division Memorandum No. 017, s. 2026. The second column paraphrases it; the rubric describes what each level looks like.

IndicatorWhat it asks for (paraphrased)Planning choice in your lesson planWhat the observer can note
1.1.2Applying content knowledge within and across curriculum areasPrecise terms and a worked example checked in advance; one planned link to another learning area or to daily lifeAccurate explanations, correct answers to learner questions, the cross-area link
1.4.2A range of strategies that build literacy and numeracyA short text to read and discuss, a written or spoken explanation, a measuring or counting taskLearners reading, writing, talking, computing
1.5.2Strategies for critical, creative and higher-order thinkingTwo or three why and how questions written in the plan; one open task with more than one answerLearners justifying, comparing, predicting, creating
1.6.2Proficient use of Mother Tongue, Filipino and English to support learningWhere learners may first explain in Filipino or their mother tongue, then restate in English with the key termsPurposeful language switching, terms used correctly
3.5.2Culturally appropriate strategies for learners from indigenous groupsLocal examples, materials or practices from the community, chosen with careLearners connecting the lesson to their community

For 2.1.2, 2.2.2, 3.2.2 and 5.3.2, we could not read the official wording from a source we could open, so we do not paraphrase them here. Copy their wording from the COT rubric (Annex E-1 of DM 089) or from the PPST in DepEd Order No. 42, s. 2017, then apply the same method: write one planned move for each, name the step where it happens, and note what the observer will see.

Since your rating depends on what is recorded in the observation notes, the rule for every indicator is the same: if it is not planned, it may not happen during the period, and if it does not happen, it cannot be rated.

What the guidelines say about your lesson plan

DM 089 does not set a lesson plan format, but it sets four rules that shape it:

  1. Submit the plan at least one day before the observation. Observers are discouraged from giving technical assistance on the plan you will be rated on, so do not expect corrections.
  2. Teach a normal lesson. The plan, materials and assessment tools should be those you actually use on regular class days.
  3. Plan for the whole period. Rating covers the entire class period, so the minutes must add up.
  4. Agree on the schedule early. The observation date is set at least three working days ahead, and the pre-observation conference reviews the indicators.

For the format, use what your school uses. In DepEd schools, DepEd Order No. 016, s. 2026 introduces the ILAW framework (Intentions, Learning Experience, Assessing Learning, Ways Forward), with the daily lesson log and detailed lesson plan formats allowed during the transition; see our ILAW lesson plan format guide.

COT planning sheet (copyable)

Keep this sheet for yourself. It is not an official form; it helps you check the plan before you submit it.

Copyable text

Copy includes the complete text. No signup needed.

COT PLANNING SHEET

Observation: 1st / 2nd Date: ______ Rubric levels: ______

Learning area and grade: ______ Topic: ______ Period: ___ min

Indicator | Planned move | Step and minute | Evidence the observer can note

1.1.2 | ____________ | ________ | ______________

1.4.2 | ____________ | ________ | ______________

1.5.2 | ____________ | ________ | ______________

_____ | ____________ | ________ | ______________

_____ | ____________ | ________ | ______________

_____ | ____________ | ________ | ______________

Show full text

Same materials and tools as a regular class day? yes / no

Plan sent to observers (at least 1 day before)? yes / no

Sample COT lesson plan: Grade 7 Science, concentration of solutions

An illustration of a teacher-made plan for the 1st observation of SY 2026-2027 (indicators 1.1.2, 1.4.2, 1.5.2, 1.6.2, 2.1.2, 2.2.2). No classroom results are claimed. Copy the exact competency and code from your curriculum guide and adjust the period length.

I. Intentions

  • Learning competency: copy the official competency on solutions and concentration, with its code.
  • Objectives. Learners should be able to: (a) identify the solute and the solvent in a solution; (b) compare the concentration of two solutions using the amounts of solute and solvent; (c) explain, in English using the terms solute, solvent and concentration, which of two drinks is more concentrated and why.
  • Why it matters: learners mix powdered drinks, salt water and medicines at home; reading amounts is everyday numeracy.

L. Learning Experience (50 minutes)

StepMinActivities and key questionsIndicators shown
Review and routines5Recall: what is a mixture? Groups receive cups and powdered juice; safety rule read aloud: nothing is tasted, spills are wiped at once. Roles assigned in each group so everyone handles materials.Check against 2.1.2 and 2.2.2 in the rubric
Activity12Groups prepare cup A (1 spoon of powder in 100 mL of water) and cup B (3 spoons in 100 mL), stir and compare colors. They record amounts in a table.1.4.2
Analysis10In groups, learners may first explain in Filipino or their mother tongue what they see; then the teacher asks: Which cup has more solute for the same amount of solvent? What would happen with 3 spoons in 300 mL?1.5.2, 1.6.2
Abstraction8Class defines solute, solvent and concentration in English. The teacher links to Mathematics: concentration compares two quantities, like a ratio.1.1.2, 1.6.2
Application10Learners read a short label on a powdered drink pack (prepared card) and decide how much water gives the taste the label recommends. Open question: design a drink twice as concentrated as cup A, in two different ways.1.4.2, 1.5.2
Assessment5Three-item exit ticket: name the solute and solvent; compare 2 spoons in 200 mL with 2 spoons in 100 mL; explain in one sentence.Evidence for all objectives

The minutes add up to 50.

A. Assessing Learning. Key: (1) solute: powdered juice, solvent: water; (2) 2 spoons in 100 mL is more concentrated; (3) it has more solute for the same amount of solvent. Success: all three correct, or two correct with a clear explanation. For more formats, see our exit ticket templates.

W. Ways Forward. Learners who met the objectives: ____ of ____. Reteach with a third cup for those who mixed up solute and solvent; enrichment on percent concentration.

Pre-observation checklist

  • The indicator list for this observation is confirmed with your rater.
  • Every indicator has a planned move in a named step.
  • The minutes add up to the full period.
  • Materials and assessment tools are the ones you use on regular days.
  • The plan is sent to the observers at least one day before.
  • You have read the rubric levels for your career stage, not only the indicator titles.

Common mistakes

  • A showcase lesson unlike your usual class. DM 089 asks for regular-day plans and materials, and learners notice the difference.
  • Indicators listed but not planned. Writing “1.5.2” in the margin does not make higher-order questions happen.
  • Too much content for one period. A rushed ending hides the assessment and the closure.
  • Reading the indicators without the rubric. The levels describe what separates one score from the next.

Frequently asked questions

What is the COT in DepEd?

The Classroom Observation Tool is the rubric and set of forms used to rate a teacher’s classroom observable PPST indicators. Under DM 089, s. 2025, it is used in two full-period observations per school year.

Which COT indicators are observed in SY 2026-2027?

For Teachers I to VII: 1.1.2, 1.4.2, 1.5.2, 1.6.2, 2.1.2 and 2.2.2 in the first observation, and 1.1.2, 1.4.2, 1.5.2, 3.2.2, 3.5.2 and 5.3.2 in the second, according to DM 089, s. 2025.

Is there an official COT lesson plan format?

DM 089 does not set one. Use your school’s format; it asks that the plan and materials be those you use on regular days and that you submit the plan at least one day before.

What COT rubric levels apply to Teacher I?

Teachers I to III are rated on Levels 2 to 6.

Is the RPMS still used?

The RPMS-PPST was suspended in July 2024; since SY 2025-2026 teachers are rated under the PMES of DM 089, s. 2025, which still uses the COT.

Continue your lesson planning toolkit